Stephen “Tommy” Cooper
Phase 1
New changing rooms were built from scratch alongside a concrete walkway and a galvanised steel barrier that was erected around the perimeter of the pitch. A permanent 150 seat stand was built onto concrete steps along with new dug outs.
Phase 2
An external generator was purchased and connected to 6 new floodlight pylons, which tested at an average Lux reading of 189. This phase was managed from delivery on-site of the lights, to working order in just 10 days and Tommy project managed the entire development.
Phase 3
This took the Ground to Step 2 Standard, and the club and Tommy have no intention of stopping there. Having been through this process, he now has vital lessons and experience which he shares with our customers. With almost 300 developments already completed, lined-up from Cornwall to Wales, to Kent, to Ayrshire.
The services provided on these developments range from:
Full turn-key solutions, with full project management, run entirely by ourselves,
To
Us providing access to discounted rates and the services of our carefully selected contractors,
To
Us manufacturing our own solutions for you, such as Floodlights (new or replacement), Covered Standing or Seating (from 50 to 500), Walkways & Player Entry Tunnels, Pitch Barriers and Perimeter Fencing, New Changing Rooms or Clubhouses, Dug Outs (8, 11, 14 or 16 Seats), Ball Stop Netting & Turnstiles, Hospitality Areas & Specialist Disabled Viewing, Toilet Blocks & TV Gantrys.